Where the new terminus “Gebersdorf” of Nuremberg’s U3 underground line is being built today, the Bibertbahn used to run. The underground is being built along much of the old railway route and reaches almost as far as the large bridge over the Rednitz. With its underground station, Gebersdorf will replace the Bibertbahn’s Fürth-Süd halt.
The old Fürth-Süd halt with the Rednitz bridge